Help : 9917745354
Date:
HOME

Documents

   Admission Procedure
Preliminary Inspection/Standing Committee Inspection Report proforma for the purpose of considering grant of affiliation of the Institutes implementing Craftsmen Training Scheme ur1er the Aegis of the National Council of Vocational Training (NCVT).
 Infrastructure

 

(a) Infrastructure, Building and Workshop

Sl. No. Ownership Document/Lease agreement for rented building In Square Meters Link to scanned Document/Image
a Total Area 920 sq meter  
b Covered Area  
c Total Class Rooms Area NA  
d Total Workshops Area 208 sq meter  
e Drawing Hall NA  
f Audio visual Hall NA  
g Computer Lab  
h Play Area  
i Library  
j Remarks  
Sl. No. Ownership Document/Lease agreement for rented building In Square Meters Link to scanned Document/Image
a Total Area 920 sq meter  
b Covered Area  
c Total Class Rooms Area NA  
d Total Workshops Area 208 sq meter  
e Drawing Hall NA  
f Audio visual Hall NA  
g Computer Lab  
h Play Area  
i Library  
j Remarks  


(b) Trade Specific Infrastructure, Building and Workshop

Trade Unit Class Room Area Per Unit Total Class Room Area for Trade Workshop Area Per Unit Total Workshop Area for Trade Remarks (Photographs etc
Electrician 1 50 SQ FT 1 200

Electric Power Supply

Present Electric Load NA
Date of Connection NA
Connection in the Name of Usha Chittor ,Shri BL ITI
Meter No. 397474
Seal No.
Remarks
Hyperlink to Document Proof  

 

   About Institute

About US
Director Message
About US
Infrastructure
Management
Technical Staff
Admission
Admission
ITI Trades
Scholarship
Gallery
Facilities
Campus
Hostel
Lecture Halls
Library
Computer Lab
Sports Amenities
 
Other Links
Contact us
Enquiry
How to Reach us
Download
Site Map
  Copyright - 2013 : 2014   Design By Nifty Online